Both the basic plan reflecting the low-depth undergroundization of the Seodaejeon overpass section and the second plan reflecting the undergroundization of Temi Pass have passed the appropriateness.
Alternative MeaningsPopularity
Both the basic plan reflecting the low-depth undergroundization of the Seodaejeon overpass section and the second plan reflecting the undergroundization of Temi Pass have passed the appropriateness.